• Journals
  • Discipline
  • Indexed
  • Institutions
  • About
JavaScript is disabled for your browser. Some features of this site may not work without it.
View Item 
  •   Home
  • Universidad del Bío-Bío
  • Revista Ingeniería Industrial
  • View Item
  •   Home
  • Universidad del Bío-Bío
  • Revista Ingeniería Industrial
  • View Item

Análisis multifactorial de varianza del desempeño de un jobshop dinámico con due dates basado en regresión múltiple

Author
Neira Rodriguez, Marcos

Salazar Hornig, Eduardo

Full text
http://revistas.ubiobio.cl/index.php/RI/article/view/171
Abstract
Se realiza un análisis de varianza mult1factorial del desempeño global de un sistema de producción tipo taller con centros de trabajo de multicapacidad (flexible jobshop ), considerando los factores regla de despacho , balance de centros de trabajo y proporción de due dates fijados externamente . El desempeño del sistema, observado mediante simulación, se evalúa a través de una medida que pondera el atraso absoluto y el tiempo de flujo. Los due dates son fijados internamente a través de regresión lineal múltiple. Los resultados estadísticos muestran que los tres factores son significativos en el desempeño del sistema, y que en escenarios donde ambas medidas tienen igual ponderación, si los due dates son fijados internamente FIFO y SPT produ­ cen mejores resultados, mientras que en presencia de due dates fijados externamente . EDD combinado con FIFO (EDD combinado con TWKR) es la mejor alternativa para el caso balan­ ceado (desbalanceado) .A multifactorial analysis of variance of the performance of a jobshop like production system with multicapacity (flexiblejobshop) is realized,by considering the factors dispatching rule, workstation capacity balance and proportion of due dates setting done externally. The system performance , observed by simulation, is evaluated by a measure that weight the absolute lateness and the flow time. Due dates setting is done intemally by multiple linear regression.The results shows that the three factors are significant with respect to the system performance, and in scenarios in which both measures are equally weighted, if the due dates setting is done intemally FIFO and SPT produces better results, while in presence of externally due date setting, EDD combined with FIFO (EDD combined with TWKR) is the better alternative for the balanced (unbalanced) case.
Metadata
Show full item record
Discipline
Artes, Arquitectura y UrbanismoCiencias Agrarias, Forestales y VeterinariasCiencias Exactas y NaturalesCiencias SocialesDerechoEconomía y AdministraciónFilosofía y HumanidadesIngenieríaMedicinaMultidisciplinarias
Institutions
Universidad de ChileUniversidad Católica de ChileUniversidad de Santiago de ChileUniversidad de ConcepciónUniversidad Austral de ChileUniversidad Católica de ValparaísoUniversidad del Bio BioUniversidad de ValparaísoUniversidad Católica del Nortemore

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister
Dirección de Servicios de Información y Bibliotecas (SISIB) - Universidad de Chile
© 2019 Dspace - Modificado por SISIB