• Journals
  • Discipline
  • Indexed
  • Institutions
  • About
JavaScript is disabled for your browser. Some features of this site may not work without it.
View Item 
  •   Home
  • Universidad del Bío-Bío
  • Revista Ingeniería Industrial
  • View Item
  •   Home
  • Universidad del Bío-Bío
  • Revista Ingeniería Industrial
  • View Item

Célula de manufatura aplicada a montagem de sub Conjuntos em material compósito para ônibus

Manufacturing cell applied to composite materials Assembly into bus manufacturing company

Author
Rech, Deandro

Full text
http://revistas.ubiobio.cl/index.php/RI/article/view/3317
Abstract
Este artigo propõe a implementação de um layout celular em um setor de acabamento e montagem de componentes compósitos em empresa fabricante de ônibus, visando elevar o aproveitamento operacional com redução das perdas e melhor aproveitamento do espaço físico. Para realização da proposta do trabalho, foi projetada uma célula de manufatura piloto, com base na formação da família de peças com processos semelhantes, com a análise dos fluxos de produção e o acompanhamento no aproveitamento dos recursos utilizados para o atendimento das demandas de peça. A partir do estudo das informações coletadas foi possível verificar o balanceamento das tarefas por meio do diagrama de precedência emétodo de utilização incremental. Neste sentido foram atendidas as expectativas para a proposta implementada em relação ao arranjo anterior, com destaque na redução das perdas por movimentação e ociosidade, consequentemente elevação nos tempos produtivos.
 
This paper proposes the implementation of a cellular layout in a sector of finishing and assembly of composite components in bus manufacturing company, in order to raise the utilization with reduction of operating losses and better use of the physical space. For achievement of the proposed work, designed a pilot manufacturing cell based on the formation of the family of parts with similar processes, with the production flow analysis and monitoring in the use of resources used to meet the demands of the play. From the study of the information collected was unable to check the balance of tasks through the precedence diagram and use incremental method. In this sense the expectations were met to the proposal implemented in relation to the previous arrangement, with emphasis on reduction of losses due to handling and idleness, consequently high productive times.
 
Metadata
Show full item record
Discipline
Artes, Arquitectura y UrbanismoCiencias Agrarias, Forestales y VeterinariasCiencias Exactas y NaturalesCiencias SocialesDerechoEconomía y AdministraciónFilosofía y HumanidadesIngenieríaMedicinaMultidisciplinarias
Institutions
Universidad de ChileUniversidad Católica de ChileUniversidad de Santiago de ChileUniversidad de ConcepciónUniversidad Austral de ChileUniversidad Católica de ValparaísoUniversidad del Bio BioUniversidad de ValparaísoUniversidad Católica del Nortemore

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

LoginRegister
Dirección de Servicios de Información y Bibliotecas (SISIB) - Universidad de Chile
© 2019 Dspace - Modificado por SISIB