Caso de fundación profunda con pilotes prefabricados de hormigón armado y monitoreo mediante Pile Driving Analyzer PDA

dc.creatorTapia, Nicolás
dc.creatorCuitiño, Matías
dc.creatorGuzmán, Aldo
dc.date2022-06-29
dc.date.accessioned2023-10-13T15:39:46Z
dc.date.available2023-10-13T15:39:46Z
dc.identifierhttps://revistas.ucsc.cl/index.php/oyp/article/view/1549
dc.identifier10.4067/S0718-28132022000100052
dc.identifier.urihttps://revistaschilenas.uchile.cl/handle/2250/235842
dc.descriptionA practical case of deep foundation for an industrial plant in Puerto Natales is presented using precast reinforced concrete piles, driven into soft clays (Nspt < 5 blows/ ft). Equipment and methods were used for the evaluation of the pile structural integrity and their geotechnical capacity by means of PDA monitoring (Pile Driving Analyzer) during driving. With the results of the PDA test, together with the CAPWAP computational tool, the design hypotheses were verified. During the execution of the project, it was possible to achieve the optimization of the embedment depth and the variation of the number of piles required.en-US
dc.descriptionSe presenta un caso de fundación profunda para una planta industrial en Puerto Natales mediante pilotes prefabricados de hormigón armado, hincados en suelos arcillosos de muy baja compacidad (Nspt<5 golpes/pie). Se utiliza equipamiento y métodos para evaluar la integridad estructural de los pilotes y su capacidad geotécnica mediante monitoreo con PDA (Pile Driving Analyzer) durante la hinca. Con los resultados del ensayo PDA en conjunto con la herramienta computacional CAPWAP, se verificaron las hipótesis de diseño, logrando, durante la ejecución del proyecto, optimizar la profundidad de empotramiento y variar la cantidad de pilotes requerida.es-ES
dc.formatapplication/pdf
dc.languagespa
dc.publisherUniversidad Católica de la Santísma Concepciónes-ES
dc.relationhttps://revistas.ucsc.cl/index.php/oyp/article/view/1549/993
dc.rightshttps://creativecommons.org/licenses/by-nc/4.0es-ES
dc.sourceObras y Proyectos; Núm. 31 (2022); 52-58es-ES
dc.sourceObras y Proyectos; No. 31 (2022); 52-58en-US
dc.source0718-2813
dc.source0718-2805
dc.subjectdeep foundationsen-US
dc.subjectdriven-precast-concrete pileen-US
dc.subjectmonitoringen-US
dc.subjectpile driving analyzeren-US
dc.subjectfundaciones profundases-ES
dc.subjectpilote de hormigón prefabricado hincadoes-ES
dc.subjectmonitoreoes-ES
dc.subjectPDAes-ES
dc.titleDeep foundation with driven precast concrete piles and monitoring with Pile Driving Analyzer PDAen-US
dc.titleCaso de fundación profunda con pilotes prefabricados de hormigón armado y monitoreo mediante Pile Driving Analyzer PDAes-ES
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion


This item appears in the following Collection(s)

Show simple item record