Show simple item record

dc.contributoren-US
dc.creatorMandujano, María Guadalupe; Estudiante de doctorado en la Pontificia Universidad Católica de Chile.
dc.creatorAlarcón, Luis F.; Pontificia Universidad Católica de Chile. Escuela de Ingeniería. Dept. of Construction Engineering and Management.
dc.creatorKunz, John; Stanford University. Department of Civil Environmental Engineering. Center for Integrated Facility Engineering (CIFE).
dc.creatorMourgues, Claudio; Pontificia Universidad Católica de Chile. Escuela de Ingeniería. Dept. of Construction Engineering and Management.
dc.date2017-02-04
dc.date.accessioned2019-05-03T12:19:26Z
dc.date.available2019-05-03T12:19:26Z
dc.identifierhttp://revistadelaconstruccion.uc.cl/index.php/rdlc/article/view/698
dc.identifier.urihttp://revistaschilenas.uchile.cl/handle/2250/83703
dc.descriptionIn recent years, the Architecture, Engineering, and Construction (AEC) industry has broadly expanded the use of Virtual Design and Construction (VDC), particularly Lean Construction methods, to deliver value to their customers. VDC includes the use of Production Management using Lean methods as an integral part of the defining theory and method, and multiple case studies have concluded that the greatest performance improvement is achieved by implementing both initiatives together. This paper reviews extensive literature of VDC and Lean Construction with the intent to show benefits in the application of Lean Construction in the actual practice of VDC and to provide examples of waste and opportunities for improvement in projects if Lean methods are applied. This study found that use of Lean methods can help to reduce waste within the VDC process, in the phase of information flow (process view). Specifically, our main finding from this study was that only five types of waste represent 80% of the referenced occurrence of waste in VDC processes, which suggests that if teams use Lean Methods and focus on elimination of these types of waste (i.e., non-value added processing, motion (excess), inventory (excess), waiting and overproduction), teams can improve VDC practices dramatically.en-US
dc.formatapplication/pdf
dc.languageeng
dc.publisherPONTIFICIA UNIVERSIDAD CATOLICA DE CHILEen-US
dc.relationhttp://revistadelaconstruccion.uc.cl/index.php/rdlc/article/view/698/156
dc.sourceRevista de la Construcción. Journal of Construction; Vol 15, No 3 (2016): Revista de la Construcción. Journal of Construction; 107-118en-US
dc.source0718-915X
dc.source0717-7925
dc.subjecten-US
dc.subjecten-US
dc.titleIdentifying waste in virtual design and construction practice from a Lean Thinking perspective.en-US
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typePeer-reviewed Articleen-US


This item appears in the following Collection(s)

Show simple item record